Join MyRWA and the City of Malden as the city unveils a new permeable road in the Forest Dale Cemetery. This road is a green infrastructure solution that replaces impervious pavement with a new surface that is able to capture stormwater runoff and store it underground, preventing pollutants from flushing directly into water bodies and limiting surface flooding.
When: Thursday, June 10th at 10:00am
Where: Forest Dale Cemetery, Malden, MA
What: Ribbon cutting for new permeable pavement and subsurface storage project
Before
After
This project was funded by the MassBays National Estuary Partnership - EPA Grant No. 4B 00A01085-0