Back to All Events

Virtual Meeting: Mystic River Exposed Pipe and Bank Restoration and Resiliency Project

Join us on zoom for a community meeting to address Continual Bank Erosion, Pipeline Safety, and Community Safety.

December 2 | 6:00 - 8:00pm

Where: Online via Zoom

Fee: Free

Benefits to the Community:

  • Improved bank restoration and erosion control through implementation of bend weirs, resulting in long term improvements and stabilization to the banks.

  • Improved resiliency of DCR parkland along the Medford Mystic riverfront.

  • A strengthened natural gas system associated with the existing J-1 system transmission line.

  • Decreased potential power outages. which can be dangerous in cold weather.

  • Positive impact on the stability of communities that depend on the natural gas distributed by the existing J-1 system natural gas pipeline.

To Learn More:

Call the Project Hotline for additional information, meetings and accommodations such as translation services at: 1(888) 331-6553

ZOOM LINK
Earlier Event: December 2
Giving Tuesday
Later Event: December 3
Davidson Park Stream Restoration Update