Back to All Events

Mystic River to Minuteman Path - Public Meeting #3

  • Mystic River Watershed Association 20 ACADEMY ST, Suite 306 Arlington, MA 02476-6401 (map)

This is the third public meeting about the Mystic River Path Connection to Minuteman Bikeway Feasibility Study. At this public meeting, Toole Design Group, the Town of Arlington’s consultant, will present the draft final Feasibility Study, with the preferred alternative, an implementation matrix, estimated costs, and illustrative graphics; review the second public survey; and discuss next steps. The remainder of the meeting will include a question and answer session for attendees. The meeting is virtual and will be recorded and re-shared for viewing by those who cannot attend it live.

This will be a remotely conducted meeting. Please register for the meeting below:

About

The Town of Arlington received funding through the state MassTrails grant program in 2021 to conduct a feasibility study on constructing a safe, accessible, separated trail between the Mystic River Path and the Minuteman Bikeway, utilizing the Mystic Valley Parkway and Summer Street in Arlington. The Town has retained the services of Toole Design Group to conduct this study and produce a plan for implementing a path along this proposed route. Project oversight is provided by the Department of Planning and Community Development in partnership with the Mystic River Watershed Association (MyRWA).