This is the second public meeting to gather community feedback on the Mystic River Path to Minuteman Bikeway Feasibility Study. At this public meeting, there will be a presentation which will include a brief summary of the results of the public survey from late January/early February; walk-throughs of the various trail and intersection alternatives, with plans, benefits and trade-offs; and photos and graphics showing opportunities and constraints of the trail project. Toole Design Group, the Town's consultant, will use both slides and a virtual whiteboard to facilitate the discussion and have attendees respond to the specifics of different project concepts. The meeting will be recorded and re-shared for viewing by those who cannot attend it live.
This will be a remotely conducted meeting. Please register for the meeting at this link: https://town-arlington-ma-us.zoom.us/meeting/register/tZYqdeuqrzsqG9RmmrV836NhqE9uTKgWmdM6
Meeting ID: 827 2221 0010
About
The Town of Arlington received funding through the state MassTrails grant program in 2021 to conduct a feasibility study on constructing a safe, accessible, separated trail between the Mystic River Path and the Minuteman Bikeway, utilizing the Mystic Valley Parkway and Summer Street in Arlington. The Town has retained the services of Toole Design Group to conduct this study and produce a plan for implementing a path along this proposed route. Project oversight is provided by the Department of Planning and Community Development in partnership with the Mystic River Watershed Association (MyRWA).
Supplementary materials for this meeting:
Mystic River Path to Minuteman Bikeway Project Scope Overview Map